Skeltonhall – Various Fiscal Metering and Prover Loop Projects Value: Ranging from £50,000 to £1M
“Further to your request for references for Haycock & Hague we have pleasure in confirming that Haycock & Hague Ltd have fabricated, assembled, tested and insulated several piping systems for Skeltonhall Ltd over the past few years with pipe sizes ranging from 1/2" to 36".
“We have always found the quality of their work to be to the highest standard and our clients have always been highly satisfied with their work.
“Haycock & Hague management and the workforce endeavour at all times to give complete customer satisfaction and this attitude and dedication has resulted in Skeltonhall Ltd continuing to place all current contracts with Haycock & Hague.
“We have no hesitation in recommending Haycock & Hague for pipe fabrication, assembly, testing and insulation.
Contact: Mr Ken Beaumont – QUALITY MANAGER
Manufacturing facility relocation - Porvair Ceramics Limited, King’s Lynn, Norfolk
4th June 2004
Porvair Ceramics Limited, a division of KL Technologies Ltd needed to relocate its manufacturing facility from its current purpose built factory to another manufacturing site owned by KL Technologies Ltd for restructuring and financial reasons.
This relocation project represented a major capital investment for the company and a major operational problem for the Ceramics division as the manufacturing process would need to be stopped for a period of time to allow essential equipment to be removed, relocated and re-commissioned.
After a consultation period it was decided to appoint a principal contract company who had the in-house trade skills and project management experience to manage all design, construction and commissioning of the new manufacturing facility.
On the basis of a previously successful business relationship between one of the tendering process and the quality of the service provided in terms of the quality of the tender documentation and willingness to work proactively along side the Porvair project team Haycock & Hague Pipework Systems Ltd were successfully awarded the contract.
The scope of work that Haycock & Hague Pipework Systems Ltd undertook included:-
All of the Haycock & Hague Pipework Systems Ltd work in all disciplines was, throughout the project, completed to the highest standard. Members of their staff whilst on site conducted themselves professionally and everyone worked very hard to achieve a very tough completion deadline.
I would especially like to mention Mr. George Vincent who acted for Haycock & Hague Pipework Systems Ltd in the role of "Project Manager" during the project duration. The main reason that this project was so successful was due to the determination, dedication and pure hard work of Mr. Vincent, he is a credit to the company.
I would have no hesitation in recommending both Haycock & Hague Pipework Systems Ltd and Mr. George Vincent for other work within this or other similar fields. It is the intention of Porvair to use Haycock & Hague Pipework Systems Ltd for future projects.
Mr Mark Butler OPERATIONS DIRECTOR

New Float Glass Plant - Guardian Industries, Goole, East Yorkshire
14th January 2004
The prestigious new float glass manufacturing plant for Guardian Industries, located at Goole, was successfully commissioned in the latter part of 2003, and is now in full operation. This construction project represents a major capital investment, and is the latest in a continuing programme of worldwide expansion being undertaken by Guardian Industries.
My own involvement with this particular development was as part of a small team of project managers, representing Guardian Industries, collectively responsible for the execution of the entire project. My specific responsibilities included the overall management of the design and installation of the factory utilities, including a 400 tonne LPG storage, vaporisation and delivery system. The LPG system is critical to the overall operation and safety of the factory, and is designed to supply LPG to fire the main glass production furnace, in the event of loss of natural gas supply.
Selected specialist companies from all parts of Europe were appointed by the project management team to undertake the execution of the various construction works contracts. Based on their proven expertise and past performance in pipework fabrication and installation, and their competitive quotation, we were pleased to select Haycock & Hague Pipework Systems Ltd as one of these specialist contractors.
Haycock & Hague were selected initially to be responsible for the utilities pipework fabrication and installation, including all the LPG pipework and the installation of the LPG storage vessels, pumping and vaporisation skid units. It was soon apparent that their resources and expertise extended well beyond their obvious abilities as a pipework contractor, and both myself and the rest of the project management team were pleased to use all their resources to the overall benefit of the project.
Haycock and Hague’s scope of work was extended not only to include other construction disciplines, such as E&I installation and thermal insulation installation contracts, but also to the provision of design and consultancy services. These services included: -
All Haycock and Hague work, of all disciplines, was thorough, high quality and completed within the exacting timescales demanded by the Guardian project management team, and within budget. Their staff were professional and courteous at all times, and were a pleasure to work with. Their combined efforts made a significant contribution to the overall success of the project.
I have no hesitation in recommending Haycock & Hague for other work in the same fields, and indeed, it is my intention that they should be involved in the next major Guardian factory construction project, which will commence in the near future.
For and on behalf of Guardian CRVC
Jean-Pierre Warrant PROJECT ENGINEER

Dear Sirs
Mallinckrodt Plant Shut-Down - May 2000
Your company were involved in our recent plant shut down during which we carried out a major overhaul of our plant. We recognise that the contribution made by both our own and your employees contributed to the whole operation being completed without a health, safety or environmental incident. This was made possible by everyone involved in the work demonstrating a high level of safety awareness.
It would be appreciated if you would thank and commend all your employees who worked on our site during the shut-down, for complying with all our site rules, procedures and for wearing the appropriate personal protective equipment.
Yours faithfully
Chris Astill
SAFETY & ENVIRONMENTAL MANAGER
22 October 1999
Dear Sirs
On behalf of Tate & Lyle Citric Acid I would like to thank your company for the services of your employees during our recent shutdown.
The crew we had on the site did an excellent job. Please convey to them our appreciation of their efforts.
Many thanks again.
Yours faithfully
(for TATE & LYLE CITRIC ACID)
W Hodgson - Engineering Manager
Haycock & Hague Pipework Systems Ltd
Selby Office - Central House, Vivars Way, Vivars Industrial Estate, Selby, North Yorkshire
YO8 8BE, Telephone: +44 (0)1757 290011, Fax: +44 (0)1757 212112
Hull Office - Malton Street, Kingston upon Hull, East Yorkshire
HU9 1BA, Telephone: +44 (0)1482 327955, Fax. +44 (0)1482 216356
Site last updated: Monday, March 01, 2010